Winery: New Proposals After Pre-Jury

After pre-jury critics, i decided to differentiate the truck road from the building. Because, it was hard to provide durable slab for the weight of them. I had needed much thicker columns. Then it had prevented the space organisation. So, i quited this idea and decide to shift the truck area to the back side of the building. Then crushing and bottleing area are replaced to near by this truck area. Then the Box Idea is still valid. The places of the boxes are changed.

perspective winery müge

Red Box: Visitor Box

Green Box: Ofice Box

Blue Box: Bottleing Box

White Box: Crushing and Fermantation Box

front winery müge

ARCH372: Accessibility Map

poster arch372 müge idil.jpgFor Arch372 course, we created an accessibility map for different types of users such as dissabled and left-handed people. Then we choose a blok of our university buildings then introduced our surveys on a floor-plan of this building. We choose Blok E and discovered that there is no way to enter the building for people with wheelchair. We hope that it will be solved when the whole construction will be ended.